top of page

GALAALTI HOTEL AND SPA CENTER - MEP SURVEY

NVC conducted MEP survey at Galaalti Hotel and Spa center located in the ecologically clean region of Azerbaijan - Galaalti and compiled a full report of all shortcomings found during the survey in this hotel. Also some urgent MEP works were done to keep the hotel operational.The following systems were tested:

  • Air conditioning and ventilation system (fan-coils, AHU, chiller, recuperation, split air-conditioners, etc.)

  • Exhaust systems

  • Water supply and treatment both of the hotel itself and of the adjacent territory

  • Sewage system

  • Hotel pools and the system for monitoring the quality and water temperature

  • Fire alarm system, sprinklers and hydrants

  • Boiler house

  • Pump stations

  • Artesian wells

  • Generators

  • Electrical system of the hotel and the surrounding area

  • Lightning protection systems

  • CCTV and access control systems

  • TV systems

  • Telephony and network infrastructure

  • Control system - BMS

  • Uninterruptible Power Systems

Also, complete project documentation was compiled for all disciplines, hundreds of photographs were taken and dozens of drawings were drawn. All works were completed in time.

bottom of page